Flooring/Packing/Finished Tile






Here is a finished shot of the slate tiling we did in the master bathroom. With the natural stone surface it doesn't matter how many times you wipe it clean with a wet sponge the surface would still give off residue. After you are finished grouting you seal the tile one last time with a gloss seal and the color comes out really well.
We are now working on laying laminate wood flooring. It is a Birch which happened to work out well with our Golden Retriever and his shedding blond hair. Mark Brackney came out for a few hours Tuesday night and helped me make some progress. The living room and kitchen should be finished tomorrow night and then we will work on the kids' bedrooms and the guest bedroom. We are doing the entire house in this surface besides the rooms we laid tile.
Our final electrical inspection should be complete tomorrow once the A/C contractor finishes his work.
Tonight Delinda packed most of the kids bedroom stuff and we will begin moving things in this weekend.



Sunday, June 10, 2007

Exterior - Brick and siding complete


The brick and siding have been finished this week. I do need to have a mailbox built from brick but it turned out I didn't have enough to complete that part of the job. We are happy to have front steps finally. Once we are moved in we will start thinking about; capping off the posts on the front porch, adding white railing on the porch and down the steps, and we will add black shutters and paint the front door black.

Inside the house, plumbing fixtures are being attached. I am adding a picture of the one in the kid's bathroom that has been completed. We are also working on laying wood laminate flooring (which is much harder than it looks on tv) and anticipating our kitchen counters being installed one week from tomorrow.

Next post I will have to get a picture of the completed slate flooring. It looks great after having been sealed.

Wednesday, June 6, 2007

Completing exterior, master bedroom paint






The exterior of the house is coming together and looking very good. Tomorrow the brick mason is going to work on finishing up the garage end of the house and will build the steps we need to the front porch and to the back door that enters the garage. We are also required to have a brick mailbox. If there is enough brick remaining I would like to also have him build steps inside the garage into the house. In the picture of the back of the house, the glass door enters at the kitchen/living room area. We are planning a deck at some point so we are not building steps there. The white door enters the garage.

The siding contractor is going to do a vinyl beadboard type porch ceiling tomorrow. We had thought of doing that ceiling of real wood beadboard but the long term would probably be best served with vinyl for holding up to weather. We will finish things off with black shutters and we are going to paint the front door black as well. We will also need to pressure wash the porch and then apply a stain.

The plumber and A/C contractor both may be working tomorrow as well. The plumber is connecting fixtures and the A/C contractor is adding some forgotten venting and connecting the equipment.

I am also attaching a picture of the master bedroom paint colors. We are going to do crown moulding around the ceilings of the first story rooms so as you can see we are not worrying about being too neat with the paint where the wall and ceiling meet.



Monday, June 4, 2007

Tile, Plumbing, Siding, Brick

Today Delinda painted in our master bedroom. Three of the walls are a gold that we have used in the dining room and the bathroom. The fourth wall where the head of the bed will be is a walnut (brown). The two look great together. Sorry no pictures, we forgot the camera today.

Tomorrow we will finish grouting and sealing the master bath slate. The slate has a good shine after the sealer is applied. On Thursday the plumber will install the fixtures and we will have running water available inside the house.

The remainder of the siding, soffit, and trim work is being done tomorrow and that work may go on into Wednesday.

In the morning I have a meeting with a garage door company to determine how much further the door opening has to be framed before a door can be installed. We currently have a 16 foot wide opening but the height is greater than 9 feet which calls for a custom ordered door.

Our brick will be finished either Friday or Saturday. We plan to begin laying flooring by Friday.