The exterior of the house is coming together and looking very good. Tomorrow the brick mason is going to work on finishing up the garage end of the house and will build the steps we need to the front porch and to the back door that enters the garage. We are also required to have a brick mailbox. If there is enough brick remaining I would like to also have him build steps inside the garage into the house. In the picture of the back of the house, the glass door enters at the kitchen/living room area. We are planning a deck at some point so we are not building steps there. The white door enters the garage.
I am also attaching a picture of the master bedroom paint colors. We are going to do crown moulding around the ceilings of the first story rooms so as you can see we are not worrying about being too neat with the paint where the wall and ceiling meet.
The siding contractor is going to do a vinyl beadboard type porch ceiling tomorrow. We had thought of doing that ceiling of real wood beadboard but the long term would probably be best served with vinyl for holding up to weather. We will finish things off with black shutters and we are going to paint the front door black as well. We will also need to pressure wash the porch and then apply a stain.
The plumber and A/C contractor both may be working tomorrow as well. The plumber is connecting fixtures and the A/C contractor is adding some forgotten venting and connecting the equipment.
I am also attaching a picture of the master bedroom paint colors. We are going to do crown moulding around the ceilings of the first story rooms so as you can see we are not worrying about being too neat with the paint where the wall and ceiling meet.