Thursday, February 8, 2007

1st story interior framing, front porch

The front porch work began today. Materials were delivered yesterday afternoon to build the subfloor support and begin layout of the porch surface. Last time I checked on things the frame around the porch was built along with some of the subfloor support. Flashing was also being applied.

Inside the house, the entire 2nd story framing is complete, we are still climbing a ladder to get up to see it because the stairs are not up yet. On the 1st story the hallway between the dining room and kitchen which leads to the master bedroom was going up.

Today was the first day of having a dumpster on sight. We only needed to rent a 10 yd, waste materials have definitely been few with a panelized construction.

No comments: