We are about 99% complete with insulation. Delinda and I got several hours in today. We still need to insulate the roof interior of the three dormer windows and we will be ready to begin putting up plastic sheeting. We will probably move onto working more on the siding as we wait for cable and phone wiring to be done.
I need to have the gravel guy come out and tell me how much it will take to raise the garage floor to the correct level before pouring concrete. We have to decide whether to spend more on raising the floor level or having a taller garage door built. The problem is that we have a good slope up to the level of the lot before going into the garage and I don't want to raise the floor so much that my driveway isn't level at all.
Monday, March 19, 2007
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment